Located east of Hinton, AB, and connected to the CN Rail mainline, the Obed facility is accessible directly from the Yellowhead highway. It also provides an exclusive bridge crossing the Athabasca river and direct access to wells in the Deep Basin. The facility will service our clients with timely and cost effective solutions to receive and deliver coated and natural premium-quality frac sand.

Production and Transload Facility

Wayfinder is offering transloading services through a temporary facility while the state-of-the-art manufacturing and transloading facility is under construction. The permanent is expected to be fully operational in late 2017. The site currently features 8 km of rail track, which can hold over 500 rail cars. The permanent transloading facility will be supported by 19,500 tonnes of silo storage and 3 truck loadouts with the capacity to service over 300 trucks in a single day. Once completed, Obed’s annual transloading capacity will exceed 1,000,000 metric tonnes.